← Back to PublicationsJournal Article
AN EX POST ANALYSIS OF THE UNCOMPAHGRE PROJECT<sup>1</sup>
Abstract
ABSTRACT: The national and regional economic impact of the Bureau of Reclamation's Uncompahgre Project which was authorized in 1903 is assessed. Benefit‐cost ratios for the project are calculated for a range of production cost estimates and discount rates. An economic base approach is used to estimate the project's regional economic impact. Although the project has been marginal in terms of an economic efficiency rationale it has been an important impetus to regional economic growth in the Uncompahgre Region over time.
Related Works
Items connected by shared entities, co-authorship, citations, or semantic similarity.
Article
Development of the Upper Colorado River
Article
The Great Gunnison Irrigation Project
Thesis
Irrigation and Landscape Change in Colorado's Grand Valley: 1880-1920
Document
The Case For Curecanti Reservoir
Document
DRAFT Environmental Assessment Upper Colorado Region
Document
Impact of The Colorado RIver Compct upon Trans-mountain Diversion in Colorado.
Dataset
Paonia Reservoir_ Modeling
Dataset
Paonia Reservoir_ Modeling
Dataset
Paonia Reservoir_ Modeling
References (2)
2 references to works outside the Knowledge Hub
