← Back to DocumentsDocument

Draft: Environmental Assessment of the Proposed Remedial Action at the Gunnison Uranium Mill Tailings Site

Date: 1990-01-01
Categories: Uranium, Environmental Contamination, Mining & Mineral Resources, Gunnison Basin
Geographic scope: gunnison basin
Source: Sustainable Living Library

Summary

U.S. Department of Energy. UMTRA Project Office. 1990.

Local Knowledge Graph (41 entities)

Loading graph...

Stakeholders (11)

Agencies, organizations, and groups mentioned as actors in this document.

United States Bureau of Land ManagementUnited States Environmental Protection AgencyUnited States Department of the InteriorUnited States Fish and Wildlife ServiceUnited States Department of EnergyJacobs Engineering Group Inc.Office of Management and BudgetCommission
Show 3 more
COERegional AdministratorUMTRA Project

External References Cited (6)

Works cited by this document, grouped by type.

other (6)

  • Jacobsen, Ken, 1989 (1990)Engineering Group Inc., Albuquerque, New Mexico, dated July 12
  • usage Grouse Di stri buti on and Habitat Use in the Gunnison Basin," in Quarterly Reoort, April, 1985, Colorado Division of Wildlife, Fort Collins, Colorado (1985)Hupp, J
  • •Revegetating Riparian Trees in South- western Floodplains,•• in Riparian Ecosystems and Their Management: Recon- ciling Conflicting Use, U.S (1985)Swenson, E. A., and C. L. Mullins
  • "Avian Use of a Desert Riparian Island and its Adjacent Scrub Habitat,u in The Condor, Vol (1985)Szaro, R. C., and M. D. Jakle
  • ••Dormant Stub Planting Techniques,• in Riparian Ecosystems and their Management: Reconciling Conflicting Uses, U.S (1985)York, J. C
Show 1 more other
  • uMaximum Floodflows in the Conterminous United States," Geological Survey Water-Supply Paper 1887, U.S (1977)Crippen, J. R. and C. D. Bue